President Abdel Fattah El Sisi on Friday inspected the pace of work at the Middle Ring Road and axes of Mohamed el Assar, Road Al Farag, and Dabaa, Presidential Spokesman Bassam Rady said.
The 156 km Middle Ring Road project extends from the city of Belbeis in the Sharkia governorate to the Dabaa corridor.
[caption id="attachment_195646" align="aligncenter" width="960"] President Sisi[/caption]
The Middle Ring Road is located in the southern area between Greater Cairo’s Ring Road and the Regional Ring Road serving all governorates of Upper Egypt, Nile Delta, and Canal cities as well as the new cities on both sides of the road in the east and west of Cairo.
[caption id="attachment_195647" align="aligncenter" width="960"] The President[/caption]
Sisi inspected the development process of Al Matariyyah district and Mohamed el Assar road axis.
[caption id="attachment_195648" align="aligncenter" width="572"] The Middle Ring Road[/caption]
The president stopped during the inspection tour to discuss with workers at the sites in the vicinity of Al-Haram area and roads of Fayoum, Aswan, and the Middle Ring Road and to follow up the progress of work.
[caption id="attachment_195649" align="aligncenter" width="960"] Details of The Middle Ring Road[/caption]
He was briefed on the executive situation of the construction, stressing the importance of finalizing the projects according to their timeline as well as implementing the anti-coronavirus measures.