Supervisor Elham AbolFateh
Editor in Chief Mohamed Wadie

Zewail City Denies Incompletion of Buildings of Its 1st Phase


Mon 09 Sep 2019 | 10:25 PM
Mai Shaheen

Zewail City of Science and Technology dismissed reports about the incompletion of the buildings of its first phase.

Zewail City said that the study in buildings of its first phase started on September 17, 2017, after they had been finalized and equipped by the latest lab equipment.

[caption id="attachment_77595" align="aligncenter" width="1024"]Zewail City said that the study in buildings of its first phase started on September 17, 2017, after they had been finalized and equipped by the latest lab equipment Zewail City said that the study in buildings of its first phase started on September 17, 2017, after they had been finalized and equipped by the latest lab equipment[/caption]

The matter encouraged the committees of the Supreme Council of Universities to approve study programs for the scientific city.

The second phase of the city is almost complete, where the final preparations are being finalized by the Armed Forces Engineering Authority, which exerts great efforts to finish all stages according to the fixed time, the city said in a statement.

[caption id="attachment_77598" align="aligncenter" width="1024"]The second phase of the city is almost complete, where the final preparations are being finalized by the Armed Forces Engineering Authority The second phase of the city is almost complete, where the final preparations are being finalized by the Armed Forces Engineering Authority[/caption]

Earlier, it celebrated the graduation of the third batch of its students in the scientific and engineering track with great excellence, as nearly 90% of its graduates had been employed within three months after graduation.

This shows the success of researchers in finding solutions to many issues of society in the fields of health, energy, environment, and others.